Finally got my stuff back from Flowcraft.
A15 H89 Head fully reconditioned. Dual Valve Springs fitted with dual valve spring locators. Short turn radius on intake ports cleaned up.




Crank has had oil holes chamfered, oil pins drilled out and taped to suit screw in grub screws, linished and fully balanced.

Rods - New 74mm pistons fitted, rods resized to suit ARP Conrod bolts, bolt seat and slightly up shaft has been shotpeened

Reground Cam and refaced followers.

Had to get my flywheel refaced and order the pressure plate from Dellow (To suit T50) in order for crank to be balanced.


Looking to start assembly this weekend!