Hey Guys, Another update.
I managed the following in the break.
1. remake front and rear brake lines
2. reinforce/paint radiator support panel for maximum airflow
3. Make up alloy intercooler piping
4. Make front pipe from dump pipe to intercooler.
5. Install new brake master cylinder
6. Install rear brake line bias valve
7. rewire parts of the engine bay
8. design, order, and fit a 23mm front swaybar
9. remake lower radiator crossover pipe
10. Move Horn
11. make/fit intercooler brackets
12. set fuel pressure on new external sard fuel pressure reg.
13. Start up engine to make sure it works after fitting new cams, valve springs, retainers etc a month ago. Started first go.
So it was a productive week. This weekend I plan to fit a ssqv blow off valve, bleed the brakes, fill it up with coolant, set the brake bias on a gravel road and then go for a drive. I'll need to get it to a tuner to dial in and make the most of the new 270 degree cams.
Latest Photos:
Page 18Page 19So there you go.