and now for the cooler stuff
step 1, remove all the old crap that will hopefully never be seen in the car again

Step 2, inspect the room you have to work with

Step 3, prepare the diff for much cooler mounts

Step 4, cut and weld stuff till it looks cool






Step 5, marvel at awesomeness



not too bad for a days work i dont think, especially considering i was still driving the car with leaves in it at 11am yesterday and stopped working around midnight
only have the top diff mounts to build, then figure out the length of the top arms and get the other tube ends tigged, and tig the top arm mounts to the bottom arms and the rear end should be done. or done enough to be pulled out and all the mounts welded up off the car
then will have to check where the brake lines can go and make the rear section of the exhaust go under the diff. hoping to have it drivable monday night as i probably wont get to do any more to it till sunday arvo or monday