well dummied it all up, no gasgets yet- have to make a brake as theres a bit of bounce in the pipe, dont want to risk it poping off a hose.

so though oh yeah i use some studs for 2 of the injector bosses in the manifold.
good idea, soft alloy and not much meat meant that they will not hold weight, so i used a bit of knead it for now to see how it goes- just to seal it all up with bolts and studs in there. i think i need to get new pipes and bosses welded on some inlet flanges
but it clears the dizzy now and i had to rotate the throttle body accelerator thing the cable goes into, so it has enough play. modded my bracket for accel cable so it will feed in on the right angle too. so cable sheath is 68 cm, with cable add 18cm. need a sheat 68+28(96) and add 21cm more cable. if i can find something to suit good. thats one long cable. also need 20cm more lpg hose.... grrr.

now the filter wont stay- will affect signal for the lpg, so need to source some 70mm 180deg hose.... so it will feed from under the tb. hotter air but lpg doesnt like ram flow into the chamber. might try for some 90 deg bend if cheaper after pay day.
looks like this side of stuff coming together, need a tie rod spliter to do the suspension..... cant find mine, thisnk another member has it on loan. hope it turns up soon.
still havent cleaned up exhaust either.