made top radiator hose. need to shorten it a bit more.
engine bay 90% wired up. had the whole 1200 harness rewired as it was a mess before.
just needs alternator/starter wired, waiting on thermos to arrive, fuel pumps and battery relocated to boot. then just the digital speedo. should be running in 2 weeks. then just need driveshaft and exhaust

